Huomuliang Wind Farm
Project capacity: Huomuliang wind farm 49.5MW
Installation: 15 units * 3300KW
Location:Lijiang City, Yunnan Province
Date:2020.12.14 completion of power generation
PPA term:25 years
Boland service
Boland can do EM service,power plant EPC service,power plant investment and acquisition.
Boland's range of services and cooperation models:
1)Wind turbine manufacturing and wind resource development investment.
2)Design and construction of photovoltaic power plants and investment in photovoltaic resource development.
3)Energy storage solution design and complementary wind&solar&energy storage solution design.
Description:
Huomuliang Wind Farm is located in Lijiang City, Yunnan Province, total installed capacity of 49.5MW, the equipped with 15 WT3300D146 units developed by CRRC, with a single unit capacity of 3300KW and an impeller diameter of 146m.
The unit integrates the original ground box transformer into a nacelle module, making it the first domestic onshore wind turbine to apply the top-mounted structure of the box transformer. The project uses large-capacity units, effectively reducing the project footprint and significantly improving power generation efficiency.