Maojing Wind Farm 400MW
Project capacity: Maojing Wind Farm
Wind farm Installation: Maojing Wind Farm 200 units * 2000KW
Wind farm Location:Gansu Province
Date:2020 completion of power generation
Wind farm PPA term:25 years
Boland service
Boland can do EM service,power plant EPC service,power plant investment and acquisition.
Boland's range of services and cooperation models:
1)Wind turbine manufacturing and wind resource development investment.
2)Design and construction of photovoltaic power plants and investment in photovoltaic resource development.
3)Energy storage solution design and complementary wind&solar&energy storage solution design.
Description:
The Maojing Wind farm uses 200 WT2000D110H80 wind turbines supplied by CRRC Zhuzhou, with a total installed capacity of 400MW.
Maojing in Gansu is located in the hilly and ravine area of Longdong Loess Plateau, with an altitude between 1650 and 2100 meters, and the whole area is in the transition zone from the southern ravine area to the northern desert area, with severe water shortage and harsh environment. Maojing wind farm conditions are difficult, the terrain is complex, wind farm service system optimization and unit power generation efficiency is the focus of the entire wind power industry.
Under these conditions, Maojing wind farm has become the first wind farm to implement intelligent operation and maintenance by CRRC Zhuzhou, which can accurately identify and solve difficult problems such as gearbox temperature control valve failure through wind farm health check system and establishment of fault identification model.