Here Are All Informations You Care About Wind Farm Project
Take a look at products description below.If you still have question,feel free to contact us email or whatsapp.
Why Boland/CRRC Is Your Best Manufacturer Of 8.x-12.xMW Series Offshore Wind Turbine?
(1) We have complete industrial chain from core components such as generator, blade, tower, gearbox, converter, supercapacitor, pitch system, to complete machine manufacturing and intelligent operation and maintenance
(2)World top 500 enterprise
(3) The whole life cycle system solution capability of wind power project, including resource development, complete machine manufacturing, project EPC, intelligent operation and maintenance
(4) At present, the sales of wind turbine generators ranked first in China, the sales of blades ranked second in China, and the sales of towers ranked third in China
(5) There is a professional engineering and technical team,Engineering and technical team of over 6,600 people.
(6) Integrated Energy Systems,based on mature products, relying on advanced system integration platform, to create a comprehensive energy system solutions for different scenarios
Main Technical Parameters
Product model | WT10000D225 | WT8500D230 | WT12000D225 |
Rated power | 10000KW | 8500KW | 12000KW |
Design air density | 1.225kg/m³ | 1.225kg/m³ | 1.225kg/m³ |
Power control mode | Variable speed pitch regulated | Variable speed pitch regulated | Variable speed pitch regulated |
Cut-in wind speed | 3m/s | 3m/s | 3m/s |
Static design rated wind speed | 10.1m/s | 9.3m/s | 11m/s |
Cut-out wind speed | 25m/s | 25m/s | 25m/s |
Survival wind speed | 70m/s | 70m/s | 70m/s |
Wind turbine grade | IEC S | IEC S | IEC S |
Service life | 25years | 25years | 25years |
Surv ival ambient temperature | -20℃~+50℃ | -20℃~+50℃ | -20℃~+50℃ |
Operating ambient temperature | -10℃~+40℃ | -10℃~+40℃ | -10℃~+40℃ |
Rotor diameter | 225m | 230m | 225m |
Hub height | 130m | 130m | 130m |
Adaptable altitude | ≤1000m | ≤1000m | ≤1000m |
Why Wind Energy Is Renewable?
Wind power is the conversion of wind kinetic energy into mechanical kinetic energy, and then mechanical energy into electric kinetic energy, which is wind power generation. The principle of wind power generation is to use the wind to drive the windmill blades to rotate, and then to increase the speed of rotation through the speed increaser to prompt the generator to generate electricity.
Wind is one of the energy sources that have no public hazards. And it is inexhaustible. For coastal islands, grasslands and pasture areas, mountainous areas and plateaus where water and fuel are scarce and transportation is difficult, it is very suitable to use wind power generation according to local conditions. And wind power does not need to use fuel and does not produce radiation or air pollution.
As a clean and renewable energy source, wind energy is receiving more and more attention from countries around the world. The amount of wind energy in the world is huge, about 2.74×10^9MW, of which 2×10^7MW is available, which is 10 times larger than the total amount of water energy available on earth. The energy of wind is so huge that at present, the energy obtained by burning coal in the world every year is only one-third of the energy provided by wind in one year.
What's Conditions For Wind Farm Site Selection And How We Recover It?
Basic conditions for wind farm construction
1.first we need get the region's perennial wind source information, the annual average wind speed at the height of the wind turbine should not be less than 6m / s.
2.topography (preferably higher or closer to, for example, the sea).
3.laying the grid conditions, extreme weather conditions, local electricity price, etc.
4.the area should be large, at least a few square kilometers or more.
5.the establishment of wind measurement tower, measurement of wind resource data for more than a year, this requires the assistance of the relevant local departments.
How to get wind resource data
"Wind" refers to the horizontal movement of the atmosphere, in the direction of movement wind always blows from high pressure to low pressure, the ultimate source of wind energy is solar radiation energy, some regions on earth are very rich in wind energy resources, such as low latitude letter wind belt, prevailing westerly wind belt and polar easterly wind belt control areas, often very rich wind energy resources.
Relying on the professional team in the field of wind resources to collect long-term weather station data, mesoscale data (MERRA, AWS, Vortex, etc.) and wind measurement data from surrounding wind power projects near the intended area, analyze the potential wind energy resources in the intended area, and collect topographic data for modeling,
combine the meteorological data for flow field simulation, draw a wind energy resource distribution map of the intended area, and select areas with better wind energy resource distribution and construction The area with good wind resource distribution and good construction conditions will be selected as the potential development site.
Boland/CRRC's service
Customers can provide site coordinates,Boland/CRRC provides free wind resource measurement and site resource assessment services to estimate wind farm power generation from site-specific power generation
Specific coordinates can be sent to marketing@boland-hydroturbine.com or Whatsapp +86 13923745989
What Boland/CRRC Can Do For Your Wind Energy Power Plant?
Boland’s range of services and cooperation models
EM: provide wind & solar & energy storage projects equipments
Wind part:we can provide Generator, wind turbine blade, tower barrel, gear box, converter, super capacitor, variable paddle system and other core components, complete machine manufacturing
Solar part:we can provide PV panel,inverter
Energy storage part:we can provide Container ,Battery & BMS System ,PCS System ,EMS Management System ,Fire control system, temperature control system, access control and lighting system
EPC service: EPC contractor wind & solar & energy storage project.
Boland/CRRC have senior EPC qualification, undertake the design, procurement, construction and commissioning services of the project, and be fully responsible for the quality, safety, schedule and cost of the contracted works.
Financial cooperation: O&M power plants,financing,acquisitions.
Boland/CRRC For project cooperation can do operation and maintenance service .Investing in the project and taking a major stake or acquiring the entire project.
Boland/CRRC 8.x-12.xMW Series Offshore Wind Turbine Advantage
1) The advantages of offshore wind power
1.Rich wind power resource, compared with onshore wind power, offshore wind power has the energy efficiency of wind energy resources 20%-40% higher than onshore wind farms.
2.High utilization hours of power generation
3.Large single-unit capacity
4.Not occupy land, due to the scarcity of land resources, onshore wind power by arable land, forest land and other aspects of the larger restrictions, while the offshore construction of wind farms do not have these problems
5.Not consume water resources
6.Suitable for large-scale development
7.Easy to transport at sea
2)Wind Farm Feasibility Report Study And Wind Turbine Design Proposal
Boland/CRRC can assist in producing feasibility reports and project design proposals,
Customers need to provide the following information:
1.project name and capacity
2.site coordinates
3.topographic map
4.land exploration report
5.Substation access point distance(feed-in tariff and figure out the local substation load margin)
3)Integrated design of drive chain to improve the reliability of the WTGS
1.The drive chain performs transmission through pure torque,which is safe and reliable;
2.The whole drive chain adopts an integrated lubrication system,simple and efficient;
3.The medium-speed permanent magnet generator has been adopted,making a better transmission efficiency.
4)Intelligent monitoring design to ensure the safe operation of the WTGS
On the basis of multi-sensor monitoring,inspection robots are arranged in the nacelle to realize real-time inspection of image,temperature,thermal radiation,gauge reading,oil level height,ad operation status,so as to realize intelligent operation and maintenance of the WTGS,ensure safe operation of the WTGS,and reduce offshore operation and maintenance costs.
5)Optimization of the nacelle layout to enhance the use experience
The nacelle adopts a brand-new design and layout optimization,which maximizes the industrial design details and interaction on the premise of meeting the nacelle operation and maintenance space,facilitating subsequent operation and maintenance and improving the use experience.
6)Complete Internal Supply Chain In Boland/CRRC
Boland/CRRC have complete industrial chain from core components such as generator, blade, tower, gearbox, converter, supercapacitor, pitch system, to complete machine manufacturing and intelligent operation and maintenance.
For the whole life cycle of wind power products,six technology platforms(system solutions, smart turbines, grid-friendly,digitalization, testing and verification of intelligent operation and maintenance services)have been constructed for the whole life cycle of wind power products to provide customers with comprehensive system solutions for new energy services.
7) Integrated Energy Wind Power System
CRRC wind power industry has formed a relatively complete industrial chain from chips, devices, components to complete machines, from new construction to operation and maintenance. It is one of the important manufacturing enterprises in the domestic wind power industry, and more than 60% of domestic wind power complete machines are equipped with products made by CRRC.
8)Highly Educated Engineering And Technical Team
There is a professional engineering and technical team,engineering and technical team of over 6,600,1 academician of the Chinese Academy of Engineering 209 professorial senior engineers More than 240 PhDs More than 3,100 masters .
9) Wind Turbine Installation And Commissioning Service
Boland/CRRC provides installation and commissioning services, after the purchase of the fan we will have a professional team to guide the installation.
Why Wind Energy Is Better Than Solar
1.Lower construction costs
2.Unlimited power generation time (24-hour power generation at any time)
3.Large unit capacity, high resource utilization, low pollution
4.Suitable for coastal islands, mountainous areas and plateau areas where water and fuel are scarce and transportation is inconvenient, and can be adapted to local conditions
How To Work With Boland/CRRC To Build One Wind Power Farm
Wind power projects in various stages of cooperation
Pre-stage: Boland/CRRC provide wind resource assessment and preliminary work support , customer prepare pre-approval work, PPA(Power Purchase Agreement), PDL (project development license) ect.
Mid-term: power plant construction, provision of EPC services.
Late stage: operation and maintenance.
Boland/CRRC usually contract for cooperation in the mid-term part, prepare the pre-approval work, and we can assist in the work with the pre-approval information.
Boland Renewable Energy Co.,LTD As an integrated new energy power company, providing youwith high quality integrated wind energy , solar energy and energy storage system solutions.Boland is now a subsidiary of CRRC, and is responsible for the overseas expansion of CRRC's wind power & solar power business. We have a relatively complete internal supply chain, service network and excellent product quality and technology.
Boland Provide power plant EPC,Power plant investment and acquisition.
Please feel free contact us if you need any technical support.Cheers for our cooperation!
My email:marketing@boland-hydroturbine.com
WA:+8613923745989