Введение
The Gansu Mazongshan Second Wind Farm 200,000 kW Project is the second phase of the Jiuquan 10 million kW wind power base allocation project in Gansu.

Geographical Location
The project is located in Subei County, Jiuquan, on the desert Gobi of the Mahair Mountains, and has the conditions for wind farm development. The wind energy resources at the project site are good, with an annual average wind speed of 7.84 m/s at a height of 70 m in the representative year of the wind farm and an annual average wind power density of 400 W/m2.

Installed Capacity
The project plans to install 50 wind turbines with a single capacity of 2000kW and 67 wind turbines with a single capacity of 1500kW, with a total installed capacity of 200,000kW and an estimated annual online power supply of 455.15 million kWh and an annual effective utilization time of 2,135 hours.

Значение
After the project is put into operation, it will save about 145,600 tons of standard coal per year, reduce the emission of soot by about 1970.6 tons (dust collector efficiency is 99%), NO2 emission by about 1683.7 tons, CO emission by about 38.3 tons, CO2 emission by about 438,000 tons and other harmful substances per year.

The Gansu Mazongshan Second Wind Farm A 200,000 kW project is located in the core area of Subei County, which has a total area of 66,748 square kilometres and is rich in wind energy resources, with a total planned wind power project of 3 million kilowatts, which has great potential for development and expansion.
The approval of the Mazongshan Second Wind Farm Area A 200,000 kW project has laid a solid foundation for the company to build a million kilowatt wind farm within the Jiuquan 10 million kilowatt wind power base.

Boland — новая энергетическая и энергетическая компания, которая сочетает в себе гидроэнергетику, энергию ветра, солнечную энергию и аккумуляторные батареи, чтобы предоставить вам высококачественные интегрированные решения для ветровой и солнечной энергии и систем хранения. Партнером Boland является компания CRRC, которая заключила контракт на проекты высокоскоростных железных дорог в Китае, и у нас есть относительно полная внутренняя цепочка поставок, сервисная сеть и превосходное качество продукции и технологии.
Пожалуйста, не стесняйтесь обращаться к нам, если вам нужна техническая поддержка.
Моя электронная почта: marketing@boland-hydroturbine.com
Вашингтон: +8613923745989
Get to know China's wind farms ------Gansu Mazongshan Second Wind Farm