Yangtian Lake Wind Farm II
Project capacity: Yangtian Lake Wind Farm II 50MW
Installation: Yangtian Lake Wind Farm II 20 units * 2500KW
Location:Binzhou City, Hunan Province
Date:2020.11.10 completion of power generation
PPA term:25 years
Description:
The second phase of Yangtian Lake wind farm construction planning a total capacity of 100MW, in two batches of construction, the first batch of the total installed capacity of 50MW, the installation of 20 sets of CRRC WT2500-D146 double-fed units, the annual online power generation is expected to 115 million kWh, in terms of quality and efficiency, the second phase of the project uses a 146-meter diameter impeller, single unit capacity of 2500 kW, through the single blade lengthening, can By lengthening the single blade, it can utilize the wind energy with maximum efficiency and ensure the overall improvement of power generation.