Yangtian Lake Wind Farm I
Project capacity: Yangtian Lake Wind Farm I 36.3MW
Installation:Yangtian Lake Wind Farm I 22 units * 1650KW
Location:Binzhou City, Hunan Province
Date:2010.7.5 completion of power generation
PPA term:25 years
Description:
Yangtian Lake Wind Farm Phase I is located in Binzhou City, Hunan Province, with a total installed capacity of 36.3MW, installing 22 sets of CRRC WT1650-85-H70 double-fed turbines with 82m diameter impellers and a single unit capacity of 1650kW.
Yangtian Lake Wind Farm Phase I is a low wind speed wind farm built by CHD and CRRC, which adopts the operation mode of "unmanned and less manned" and has excellent wind farm performance.
Боланд сервис
Boland может предоставить услуги по ЭМ, услуги по проектированию, закупкам и строительству электростанций, а также инвестиции и приобретение электростанций.
Спектр услуг и моделей сотрудничества компании Boland:
1) Инвестиции в производство ветряных турбин и развитие ветровых ресурсов.
2) Проектирование и строительство фотоэлектрических электростанций и инвестиции в развитие фотоэлектрических ресурсов.
3) Разработка решений по хранению энергии и разработка дополнительных решений по хранению энергии ветра и солнца.
Фото растений



